Image
Expansion of the solar power plant in the H.R.G.
Published on 17 December 2020
Czech Republic
This is the good practice's implementation level. It can be national, regional or local.
About this good practice
Aim of the project is to increase the efficiency of the operation by reducing the electricity consumed by the off-set and digital printing company with the increased production from the extended installed photovoltaic power plant. The PV electricity power generation will increase by 303.6. kWp, which will contribute to the annual savings of final energy consumption of 286.8. MWh.
The implementation of the project will result in the following changes:
- reduction in the total amount of electricity collected by 826.1 GJ/year and subsequent cost reduction by 576.500 CZK/year
- reducing energy consumption and reducing emissions (the amount of emissions of primary particles and secondary particulate matter precursors and CO2 emissions) to the environment, thereby increasing the positive impact on the environment
Total project costs: 231 539 EUR
Payback period: 14 years
Investment costs per installed kW: 762,61 EUR/kW
The implementation of the project will result in the following changes:
- reduction in the total amount of electricity collected by 826.1 GJ/year and subsequent cost reduction by 576.500 CZK/year
- reducing energy consumption and reducing emissions (the amount of emissions of primary particles and secondary particulate matter precursors and CO2 emissions) to the environment, thereby increasing the positive impact on the environment
Total project costs: 231 539 EUR
Payback period: 14 years
Investment costs per installed kW: 762,61 EUR/kW
Resources needed
Total project costs: 231 539 EUR - Combination of the private financial sources and EU subsidies.
Evidence of success
The power plant was installed successfully. In the first year of operation produced 288.3 MWh of the electricity (of which 233.8 MWh was consumed, delivered to a network of 54.5 MWh), which represents a saving on unbought electricity of 320.000 CZK (12.308 €).
By the installation of the photovoltaic power plant the H.R.G. company saved
CO2 emissions at about 273 tons per year.
By the installation of the photovoltaic power plant the H.R.G. company saved
CO2 emissions at about 273 tons per year.
Potential for learning or transfer
Good example of efficient installation and usage of the PV pannels.
Further information
Website
Good practice owner
You can contact the good practice owner below for more detailed information.
Organisation
Czech Technical University
Czech Republic
Střední Čechy
Contact
Researcher, finance expert