About this good practice
The full reconstruction of the whole - 9.6 km long - tram line (between the terminals: Tiszai railway station ā DiĆ³sgyÅr), the traffic, service station and access tracks and their accessories has taken place. The old tramline network became lengthened with 1.5 kilometers and the line between DiĆ³sgyÅr Terminal and FelsÅ-MajlĆ”th was constructed. The city tram tracks has been refurbished completely and new platforms and shelters were built. The boarding gap complies with the requirements of the act on equal opportunities ā it is suitable also for people using a wheelchair and transportation of bicycles. The purchase of 31 pieces of low-flow tram vehicles - considered to be one of the most advanced vehicles in the world - took place. The new Skoda trams are 100% low-floor trams, with up-to-date passenger information system. The new vehicles have increased capacity and fed back braking energy. The power transfer structure of the company has changed, therefore were built the 5 pcs power transfers station. Vehicle service station and maintenance equipment has been refurbished . The energy regeneration system of the tram is an important element to ensure sustainability. The tram tracks was built with an advanced noise and vibration absorb systems.
Expert opinion
Public transport should be comfortable, convenient and accessible, to encourage a modal shift from private vehicles. This practice is a good example of tramline renovation, with new tracks, more accessible platforms, the provision of weather shelters and a passenger information system. It has also taken account of mobility limitations, making sure to be wheelchair accessible. Regional funding from the EU is available in all EU member states for such investments.
Works at
Interreg Europe Policy Learning Platform
Resources needed
The whole project budget was 112 million euros (co-funded by the EU through domestic OP).
Evidence of success
Development and renewal of a new, modern urban tram track transport.
Ensuring the equal opportunities on the new trams people for e.g. with wheelchairs, baby carriage, more comfortable and spacious vehicles for passangers. The travel time between the terminals was diminished thanks to the new track line and integrated passanger informations system.
The design of tram vehicles choosen by citizens with an online voting. On all trams available free WiFi on board.
Ensuring the equal opportunities on the new trams people for e.g. with wheelchairs, baby carriage, more comfortable and spacious vehicles for passangers. The travel time between the terminals was diminished thanks to the new track line and integrated passanger informations system.
The design of tram vehicles choosen by citizens with an online voting. On all trams available free WiFi on board.
Potential for learning or transfer
Geographical boundaries, authoritiesā interests, official regulations may make compromises indispensable.
There is no sense to see mobility project as isolated developments, the āwhole pictureā must be kept in mind (tram line reconstruction, green city aspects, conjunctions development, information system development etc.).
Citizens forums and polls held during the project to aim important to the greater acceptance of development. The development was preceded by numerous demand surveys and passenger counts. During the investment and the construction work, a lot of information communication material and leaflets were prepared for informing the public. The citizens was engaged in proposing/choosing the outside appearance of the trams.
There is no sense to see mobility project as isolated developments, the āwhole pictureā must be kept in mind (tram line reconstruction, green city aspects, conjunctions development, information system development etc.).
Citizens forums and polls held during the project to aim important to the greater acceptance of development. The development was preceded by numerous demand surveys and passenger counts. During the investment and the construction work, a lot of information communication material and leaflets were prepared for informing the public. The citizens was engaged in proposing/choosing the outside appearance of the trams.
Further information
Website
Good practice owner
You can contact the good practice owner below for more detailed information.
Organisation
Miskolc Public Transportation Company (MVK Plc.)
Hungary
Ćszak-MagyarorszĆ”g
Contact
analyst-monitoring officer